!!Projects per year
المشاريع
- 2 نشط
-
Development of a Thermo-Fluid System Model for an Engine with Heat Exchange and Working Fluid Evaluation
Sultan, A. (PI)
1/09/25 → 30/09/27
المشروع
-
Techno-Economic Assessment and Optimization of a Concentrating Solar Power Plant with Fossil Fuel Backup
Sultan, A. (PI) & QABAZARD, A. (CoI)
1/04/25 → 1/04/27
المشروع